I'm considering a 2nd QM2K for running a dual scan head projector. I'm just wanting to confirm that the 2 QM2K can work together with a different scan rate? Basically, I have 1 scan head I want to run at 30K and the other at about 18K. So I'm assuming you can set this up in LD/ST, then go the ST timeline and assign track 2 to the 2nd scan head and it will display track 2 at 18K while the other tracks are displaying on scan head 1 at 30K. Can it work this way?!
Thanks!
David

Thanks!
David